Under the overpass

Repair work is well underway on the Sumas Way overpass in Abbotsford.

  • Aug. 4, 2011 1:00 p.m.
Repair work on the Sumas Way overpass to Highway One is well underway. Northbound Sumas Way traffic is down to one lane, and overwidth trucks are not permitted. The structure was damaged when a semi truck with an oversized load struck it on June 7. Damage was estimated at $300,000.

Repair work on the Sumas Way overpass to Highway One is well underway. Northbound Sumas Way traffic is down to one lane, and overwidth trucks are not permitted. The structure was damaged when a semi truck with an oversized load struck it on June 7. Damage was estimated at $300,000.

Abbotsford News