5:45 p.m. scene from the City of Victoria Johnson Street Bridge project webcam shows a sleek shape for the new structure, after the bridge deck was lifted and lowered into place Sunday. Further work will be done Monday, requiring continued closure of the old bridge to traffic until at least 5 p.m. YouTube

New Johnson Street Bridge takes shape on Victoria’s harbour

Installation of bridge deck a slow but sure operation, old bridge closed Monday too

It was a slow process Sunday to hoist the 470-tonne bridge deck span in the air, swing it around and lower it into place against the giant rings previously installed for the new Johnson Street Bridge.

But by about 5 p.m., the deck sat illuminated, mostly lined up with its mated pieces, as a beautifully mottled, cloudy sky at sunset provided a colourful backdrop.

Facebook

Onlookers gathered at various points on both sides of the harbour to watch the action through the day, which started just after 7 a.m. with the span perched on a barge a stone’s throw from the wintertime stable of the Victoria harbour ferries.

The rain that came in sheets at times sent crowd scrambling for cover, but as the wet stuff eased off the people came back out to watch the deck lifted in a sling by the barge-bound Dynamic Beast crane, and guided ever so subtly toward its final resting place.

Tweet

More work will be done Monday on the project and it will require continued closure of the existing bridge. Commuter traffic will be rerouted over the Bay Street Bridge, which already sees congestion in the mornings. Drivers are asked to make considerations for timing and alternate routes.

RELATED: Winds cancel Johnson Street Bridge work for Saturday in Victoria

editor@vicnews.com

Just Posted

Most Read